12m Power Cable For Flymo Glide Master 340 380 Lawnmower Extra Long Lead Plug

Regular price $21.86
Sale price $21.86 Regular price
Unit price
Compare Ask a question

Ask a Question

* Required fields

Size guide Share
  • Free Shipping & Returns: On all orders over $60

12m Power Cable For Flymo Glide Master 340 380 Lawnmower Extra Long Lead Plug

12m Power Cable For Flymo Glide Master 340 380 Lawnmower Extra Long Lead Plug

Regular price $21.86
Sale price $21.86 Regular price
Unit price
Product description
Shipping & Return

12 Metre Power Cable For Flymo Glide Master 340 380 Lawnmower

Brand new high-quality compatible replacement mains cable & plug for your Flymo garden appliances.

Specification: 12 metres, 2 core, 1.00mm flex, BS1363/A Certified

Please Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.

Fits models:

FLYMO

Flymo Glide Master 340 Lawnmower

Flymo Glide Master 380 Lawnmower

**Important notice:  Appliance repairs must always be carried out by a suitably qualified engineer or technician.**

**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.


Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.

We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.

Why Mhkshopmotfy?

30 Days Return

Enjoy a seamless shopping experience, facilitated
by our complimentary shipping.

Online Support

Our dedicated team provides timely assistance,
committed to addressing your queries.

Free Shipping

Free Shipping for orders over £60

Recently Viewed Products