{"product_id":"open-data-communication-in-building-automation-controls-and-building-management-control-network-protocol-power-line-channel-specification","title":"Open Data Communication in Building Automation, Controls and Building Management. Control Network Protocol - Power Line Channel Specification","description":"\u003ch2 data-mce-fragment=\"1\"\u003e\n\u003cstrong data-mce-fragment=\"1\"\u003eWhat is BS EN 14908-3\u003cem data-mce-fragment=\"1\"\u003e - Control Network Protocol - Power Line Channel Specification\u003c\/em\u003e\u003c\/strong\u003e \u003cstrong data-mce-fragment=\"1\"\u003eabout? \u003c\/strong\u003e\n\u003c\/h2\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908 \u003c\/strong\u003eEuropean standard for open data transmission in building automation, control, and in building management systems. \u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3 \u003c\/strong\u003eis the third part of the multi-series standard that specifies the Control Network Power Line (PL) Channel and serves.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3 \u003c\/strong\u003especifies all the information necessary to facilitate the exchange of data and control information over the power line medium for networked control systems in commercial Building Automation, Controls and Building Management.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3 \u003c\/strong\u003eestablishes a minimal set of rules for compliance. \u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3\u003c\/strong\u003e does not rule out extended services to be provided, given that the rules are adhered to within the system. It is the intention of the standard to permit extended services (defined by users) to coexist.\u003c\/p\u003e\n\u003ch2 data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eWho is BS EN 14908-3\u003cem data-mce-fragment=\"1\"\u003e - Control Network Protocol - Power Line Channel Specification\u003c\/em\u003e for?\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3\u003c\/strong\u003e on Control Network Protocol - Power Line Channel Specification is useful for:\u003c\/p\u003e\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003eHome and building electronic system installers and manufacturers\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eSoftware engineers\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eConstruction companies\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eMaintenance personnel\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 data-mce-fragment=\"1\"\u003e\n\u003cstrong data-mce-fragment=\"1\"\u003eWhy should you use BS EN 14908-3 \u003cem data-mce-fragment=\"1\"\u003e- Control Network Protocol - Power Line Channel Specification\u003c\/em\u003e\u003c\/strong\u003e\u003cstrong data-mce-fragment=\"1\"\u003e? \u003c\/strong\u003e\n\u003c\/h2\u003e\n\u003cp data-mce-fragment=\"1\"\u003ePower Line Channel is used for data communication by transferring data over existing power lines. By using a power line as a communication network, it is possible to build a system at a low cost and early stage.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eThe purpose of \u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3\u003c\/strong\u003e is to present the information necessary for the development of a PL physical network and nodes to communicate and share information over that network.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3 \u003c\/strong\u003eprovides a set of guidelines on physical and electrical specifications for the power line environment as an aid in developing products for that environment. \u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3 \u003c\/strong\u003eis intended to be used by all the entities involved in the design, manufacture, engineering, installation, and commissioning activities establishes a minimal set of rules for compliance\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eTherefore, \u003cstrong data-mce-fragment=\"1\"\u003eBS EN 14908-3\u003c\/strong\u003e leads to the lower level of operational costs of automation equipment, especially for long high-voltage power transmission lines.\u003c\/p\u003e","brand":"BSI Shop","offers":[{"title":"Digital","offer_id":45293031653558,"sku":"000000000030265790","price":176.9,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0731\/8251\/1286\/files\/Digital_d26df0e4-ea8a-47d6-ba4f-ce40b86e274a.png?v=1785163467","url":"https:\/\/mhkshopmotfy.com\/products\/open-data-communication-in-building-automation-controls-and-building-management-control-network-protocol-power-line-channel-specification","provider":"Mhkshopmotfy","version":"1.0","type":"link"}